Sr. Project Manager, Construction
Save this job and keep your search organized
Create a free account to save jobs, create alerts and return to this listing from your dashboard.
By continuing, you agree to our Terms & Privacy Policy.
Consultant, Senior Project Manager, Construction
Summary
The Senior Project Manager (SPM) will drive the design milestones to completion, manage the construction and closeout phases, and hand the project back in a fully documented state at the end of the term. In addition to the NJ Phase 2 project, up to two additional small- to medium-sized projects (under $10MM), or one larger project ($10 to $50MM), are in scope and may be assigned subject to the individual's bandwidth. The SPM will be maintain uninterrupted owner's-representative delivery on the NJ Office Phase 2 fit-out during a gap in permanent project management staffing.
Responsibilities
Owner's Representative Continuity
- Act as the single point of owner's-representative accountability for Warren Phase 2 for the duration of the term.
- Take handover from the interim project manager within the first two weeks, including open action items, correspondence history, contract status and outstanding decisions.
- Maintain decision-making and escalation protocols established at design kickoff; escalate to the Associate Director where authority limits are reached.
Design Management
- Chair or co-chair the recurring weekly design meeting (Wednesdays, 11:00 AM – 12:00 PM) and hold Gensler to issuing agendas 24 hours prior and minutes 24 hours after each session.
- Manage the milestone review cycle through SD, DD, 50% CD, 100% CD and Issued-for-Bid, coordinating reviewers to close each seven-day window on time.
- Administer all drawing-set reviews and markups in Bluebeam, and confirm the design team provides a written response to every comment with no open or unaddressed markups.
- Confirm the Design Manual is adopted as the governing standard and that the approved Level 1 and Level 2 test fits remain the basis of design.
- Manage scope discipline against the approved program and lease Work Letter parameters; develop and price cost-saving options during design.
Due Diligence Closure
- Bring the open technical due-diligence register to resolution prior to Final Design Sign-Off (10/30/2026), including:
- Auditorium AV — assess the state of existing systems and confirm the retain-versus-replace approach.
- IDF closet count required for the build-out, and the IT wireless access point heat map.
- Level 1 and Level 2 pressurization, balancing and pre-balancing with the landlord.
- Medium-pressure duct leakage and VAV sound attenuation with plenum makeup air, applying lessons from Levels 3 and 4.
- Finishes discontinued since Phase 1 completion, and hoteling unit mounting details on office glass.
- Security desk removal at elevator lobbies and Level 3 elevator lobby temperature control findings, as they inform Phase 2 design.
Schedule and Project Controls
- Own, maintain and report the owner-side project schedule in Microsoft Project, including critical path, dependencies, float and variance analysis.
- Maintain project records, workflows and approvals in Oracle Unifier; keep assigned tasks current and prevent overdue workflow items.
- Produce the monthly Project Status Report (PSR) and any ad hoc reporting requested by ED&C leadership.
- Maintain the risk and issues register with owners, mitigations and dates.
Financial Management
- Manage the project budget against approved funding of $7.552 MM; track commitments, actuals, forecast and cash flow.
- Maintain monthly accruals and cash-flow projections in the established project workbook format.
- Administer change control on design and consultant scope; validate invoices and change requests before approval.
- Support preparation of the construction-phase Project Approval Memorandum (PAM), including truing up allowances carried in the design-phase request (IT hardware, furniture, commissioning, demolition, long-lead HVAC, laser scanning, permits).
- Coordinate requisitions, purchase orders, SOWs and amendments with Global Procurement and Legal.
Landlord, Lease and Permitting
- Manage the interface with the landlord (Vision / Warren Corporate Center) as the constructing party, and coordinate landlord-side reviews and approvals.
- Support the Level 1 Work Letter and any amendment required to extend the existing scope of work from the second floor to the first floor.
- Track the anticipated Level 1 tenant improvement allowance of approximately $1.876 MM through lease amendment negotiations. Note that no TI allowance remains for the second floor.
- Manage permit strategy with the Town, ensuring comments carried over from the Levels 3 and 4 permit process are addressed in the new application, and coordinate Certificate of Occupancy requirements.
Cross-Functional Coordination
- Coordinate IT and Network Engineering requirements, including the n